3 x New/Unused Siemens SGT 800(2022) Set @ 54 MW:
3 x New/Unused Siemens SGT 800(2022) Set @ 54 MW:
**Subject:** Corporate Offer for Supply of Three (3) Siemens SGT-800 Gas Turbines
We are pleased to present our corporate offer for the supply of **three (3) new and unused Siemens SGT-800 gas turbines (2022)**. Kindly note that the pricing is based on **Incoterms Ex Works delivery**.
### **Key Specifications**
First to send LOI / POF / Deposit into escrow
1. **Model:** Siemens SGT-800 Gas Turbines
- Industrial power generation and oil and gas applications
- Fuel: Natural gas or liquid fuel (configurable for gas-only, liquid-only, or dual-fuel operation)
- Frequency: Operable at 50Hz or 60Hz for versatile applications
- Heat Rate: 9,123 kJ/kWh (8,892 Btu/kWh)
- Turbine Speed: 6,600 rpm
- Pressure Ratio: 22.0:1
- Exhaust Mass Flow: 137.7 kg/s
- Exhaust Temperature: 564°C
- NOx Emissions: < 15 ppmvd
2. **Ex Works Price:** €34,550,000 per unit
3. **Additional Details:**
- Each turbine comes with a **full Siemens OEM warranty**.
- Complete scope of supply details are attached.
### **Payment Terms and Inspection**
1. **Down Payment:**
- 15% of the Ex Works price upon execution of the Purchase Sale Agreement.
- The down payment can be deposited in a **bank-managed escrow account** (e.g., Credit Suisse).
- Payment will be monetized only after turbine inspection at the Siemens factory in Germany (inspection recommended via **SGS certification**).
2. **Remaining Balance:**
- 85% of the Ex Works price, payable via:
- **Electronic transfer** to the supplier’s account.
- Confirmed, transferable **Documentary Letter of Credit** or **Standby Letter of Credit** in favor of the supplier.
### **Requirements for Proceeding**
1. Submission of a formal **Letter of Intent (LOI)** addressed to Teknotek Ltd.
2. Provision of **Proof of Funds** alongside the LOI.
3. Completion of a **Know Your Customer (KYC)** questionnaire provided by us.
### **EPC Considerations (Turn-Key Project)**
Given the lack of detailed information (e.g., installation locations, existing infrastructure, living facilities for technicians, and transportation methods), we can only provide a **general estimate** of expenses related to an EPC (turn-key) project at this time.
After reaching a purchase agreement (including the signing of the LOI and receipt of the 15% down payment), we will connect you with a trusted installation company. They will provide a separate contract, ensuring realistic quotations for all associated services. Siemens will supervise the installation process, oversee labor execution, and assist in turbine commissioning upon completion.
### **Closing Statement**
We are confident in our proposal and remain at your full disposal to address any questions or concerns. Thank you for considering this opportunity.
#Ray/jet