28/04/2025 - Power Plant Offer - Alstom GT13 DM EV 103MW Gas Turbine + Brown, Boveri & Cie Steam Turbine 50MW - COMBINED CYCLE 150MW POWER PLANT
28/04/2025 - Power Plant Offer - Alstom GT13 DM EV 103MW Gas Turbine + Brown, Boveri & Cie Steam Turbine 50MW - COMBINED CYCLE 150MW POWER PLANT
Sale Offer: 150 MW Gas-Fired Power Plant in Austria
Direst to exclusive agent to sell this 150 MW gas-fired power plant located in Austria.
The plant is in exceptional condition, with low operating hours and ready for immediate operation.
Below are the key details:
Facility Overview
Type: Combined Cycle Power Plant
Location: Austria
Condition: Very good, well-maintained, and operational at any time.
Capacity: 150 MW (Gas Turbine: 103 MW; Steam Turbine: 47 MW)
Efficiency: Electrical efficiency of 50%
Startup Time: Full load achievable within 25–120 minutes
Load Gradients:
Gas turbine: 7.9 MW/min
Combined block: 8.5 MW/min
Historical Highlights
1980: Facility upgraded to a combined cycle unit with an output of 125 MW. Efficiency achieved: 47.9% (world-leading at the time).
2003-2005: Replacement with a more powerful gas turbine, increasing capacity to 158 MW.
Design Excellence: Combines a gas turbine and forced circulation boiler for steam generation with a steam turbine.
Technical Specifications
Gas Turbine: Alstom GT13 DM EV (103 MW, ISO standards)
Waste Heat Boiler: Wagner Biro (dual-pressure, forced circulation design)
Steam Turbine: Brown, Boveri & Cie - BBC (50 MW, single-shaft condensing turbine with dual-pressure feed)
Grid Integration
The power generated is fed into the 110 kV grid through a dedicated substation and overhead line.
Pricing & Additional Details
Total Price (Including Spare Parts): €35 Million EUR
Spare Parts Value: €10 Million EUR (due for major turbine service in approx. 10,000 operating hours)
Dismantling Costs: €4.8 Million EUR
Transport to Port Koper, Slovenia: €960,000 EUR
Includes 10 heavy transports (total: €234,000 EUR)
Total Dismantling and Transport Cost: €5.994 Million EUR
Brand New Plant Cost Estimate: Over €200 Million EUR (calculated at €1.4M per MW for 150 MW)
Site Visit
Visits can be arranged promptly at the Austrian site. Please note that an LOI (Letter of Intent) and POF (Proof of Funds) with 5% deposit into escrow are required for appointment scheduling.
Should you have any questions or require further information, please do not hesitate to contact me. I look forward to hearing from you!
#greg
PAYMENT METHODS:
Copyright: Asian Dragon International Enterprise. 2011-2025 All rights reserved.
DISCLAIMER:
Brand logos and other marks indicated on our website are trademarks or registered trademarks of the brand owner, or its subsidiaries and authorized distributors (collectively ), in the United States, Canada and/or other jurisdictions. Graphics, logos, page headers, button icons, scripts and service names are the trademarks or trade dress of the brand owners and their licensed distributors. Trademarks and trade dress are not used in connection with any product or service or in any manner that is likely to cause confusion among customers that we are authorized distributors of any brand or in any manner that disparages or discredits the brand . All trademarks, logo's or slogans not owned by Asian Dragon International that appear on this website are the property of their respective owners, who may or may not be affiliated with, connected to, or sponsored by Asian Dragon International.
Home
Subscribe
Daily Deals
Featured Deals
Hot Deals
Special Deals
Import/Export
Terms & Conditions
Samples
Purchase Policy
Categories
Scammer Alert
About
Contact