SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


RFQ SGT5-2000 Power Block


RFQ SGT5-2000 Power Block

Inquire

Catalog #179018

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: September 14, 2025 21:27

Inquiry Regarding SGT5-2000 Power Block - Representing a Serious Buyer



A very serious and interested buyer based in the Middle East looking to purchase a SGT5-2000 combined cycle power block.

To allow my client to proceed with a preliminary evaluation and prepare a potential offer, we require further detailed information.

We would be grateful if you could provide the following:



Commercial & Procedural Details:



1. Requested Price: The price of the power block in its current condition and location (in USD or EUR).

2. Sellers Procedure: A outline of your standard transaction and due diligence procedure.

3. Inspection Details: The estimated process, timeline, and cost for a preliminary inspection by a 7-person technical team for a duration of 5 days to verify documents against actual conditions.

4. NCNDA: Please provide a draft of your Non-Circumvention, Non-Disclosure Agreement (NCNDA) to facilitate formal discussions.

5. Broker Commission: Please confirm your offered fair brokerage commission structure for this transaction.



Technical & Operational History:



1. Maintenance & Preservation Status: Detailed description of the current maintenance and preservation status of all equipment. Has the equipment been under a formal preservation program since shutdown?

2. Operational Logs: Are comprehensive operational records, log sheets, maintenance history for the turbines, HRSG/boiler, and BOP equipment available for review?

3. Emergency Shutdowns: The number of emergency shutdowns (ESDs) the units experienced throughout their operational history.

4. Performance Data: The typical NOx and COx emission levels, as well as vibration levels, recorded during normal operation at base load.

5. Cooling Systems:

· What is the primary cooling system for the turbines? (e.g., mechanical draft cooling tower, ACC, once-through seawater, etc.)

· What is the cooling system for the generators? (e.g., water, hydrogen, oil, etc.)

6. Post-Shutdown Care: Since the end of operation, have the generator and turbine shafts been rotated periodically to prevent bearing damage? Are there records of this activity?

7. Photographic Evidence: Please provide as proof of life :

· Photos of the nameplates for the main equipment (Turbine, Generator, HRSG, etc.).

· Recent photos of the log sheets.

· General photos showing the overall current condition of the power block, turbine hall, and control room.

8. Scope Clarification: Please confirm the inclusion or exclusion of the upstream switchyard and the status of the Balance of Plant (BOP) equipment.



Your prompt response and provision of this information will be highly appreciated and will significantly accelerate our clients decision-making process.

Thank you for your time and cooperation.

We look forward to your reply.

#khosro





Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

2019 John Deere 370E Off Road Truck FOR SALE  **Ditch Witch HDD** Siemens SGT5-2000E - Turbines / Equipments - Combined Cycle Power Plant - 670 MW - UNUSED - Ref : P /AA-87 -24.7-1 DEUTZ GAS ENGINES TCG 2020V20 - Ref : P / AA -94 - 2- BAT - PRICE REDUCED Komatsu WA500-1L Wheel Loader, Needs Work!