Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


3 x SIEMENS SGT 5/6-2000E (94.2)


3 x SIEMENS SGT 5/6-2000E (94.2)

Inquire

Catalog #179601

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: October 08, 2025 21:59
Page Views: 127

We are pleased to offer 3 NEW 166 MW ea Generating sets.



To be clear, the Gas Turbines and accessories are ready for shipment with the SPEED INCREASER and GENERATOR shipping in 8-9 months, long before the installation is completed.



(3 SGT 5/6 2000E available right now & 3 more after these , & another 2 to follow 8 Total @ 166 MW)



The installation of these large Turbines are normally 12 months, so the installation time will not be affected.

Full Factory warranty. 100%



Factory Technical assistance on install included



SIEMENS SGT



5/6-2000E (94.2)



GENERATION PACKAGE



POWER GENERATION 498 MW



Gas fired



FREQUENCY (60 Hz)



OFFER – 3 x SGT5/6-2000E (94.2) UNITS



We are pleased to provide this offer with the purpose of presenting a technical and commercial offer for Three (3) SGT5/6-2000E turbines.



With the factories assistance we are providing the conversion of a 50 Hz Turbine set to a 60 Hz one.



The major items will be shipped immediately and the Speed increaser & Generator will be delivered long before the installation is completed.



Technical Overview



Model: Siemens SGT5/6-2000E (Version 94.2)



Output: 166 MW per unit (base load)

Configuration: Simple cycle; convertible to combined cycle or CHP

Fuel: Natural gas (other fuels possible with modification)

Condition: Brand new, never used, zero hours

Location: Stored in secure Warehouse

Serviceability: Full Siemens OEM support, global spares availability, robust installed base (separately quoted service)

Conversion for 60Hz operation:



Addition of 3 off step-up gearboxes 180MW power 1:1,2 ratio.

Input speed 3000 rpm

Output speed 3600 rpm

Matching 3 units 200MVA each Generators 60Hz × 3600 rpm.

All new additional equipment shall carry the manufacturer’s warranty 12 months minimum.



All existing switch gear shall be operational through frequency converters to ensure 60Hz operation throughout the entire power plant.



Design Features:



Proven Siemens E-class technology with >30 years of operational track record

Modular construction for ease of transport, installation, and inspection

Long component life and robust preventive maintenance regime

High reliability and low operating costs



Commercial Offer



Price per Turbine Unit: EUR 129,000,000

Price per Gearbox: EUR 5,214,000.00

Price per Generator: EUR 9,296,000.00

Delivery Terms:



Timeline Turbine Units: Immediate availability; 4 weeks FCA Germany (Incoterms 2020) after full payment

Time Gearbox and Generator: FCA Delivery is estimated at 8 to 9 months.

Exclusions



Transportation beyond FCA Germany

All duties and taxes

Exhaust Characteristics



Exhaust gas flow: ~368 kg/s (˜ 811 lb/s)

Exhaust temperature: ~532 °C (˜ 990 °F)

Dimensions & Weight (Gas Turbine Only)



Length × Width × Height: ~9.1 m × 3.3 m × 3.3 m (˜ 30 ft × 11 ft × 11 ft)

Weight: ~108,000 kg (˜ 238,000 lb)

Reliability & Maintenance



Fleet reliability: >99%

Equivalent operating hours (EOH) across fleet: >9 million

Maintenance-friendly design:

Horizontally split casing for easy rotor access

Walk-in combustion chambers

Hot-path inspection without lifting upper casing

Rotor with Hirth-serrated discs for on-site disassembly

General Commercial Terms:



Warranty: 12 months post-commissioning, Siemens supervised



Includes: Technical documentation, manufacturer certifications, operation manuals



Inspection: To be carried out jointly with Siemens personnel, who will certify the equipment to be supplied

Offer Validity: Subject to prior sale



Purchase Procedure:



1. Submission and Review of Purchase Order (PO)



2. Inspection: Available at secure warehouse (Inspection Fee: EUR 250,000/unit)



3. Issuance, Review, and Signing of Contract: Drafting, reviewing, and signing the contract with mutual agreement on contractual clauses.



4. Full Data Disclosure: Once signed, we will disclose all technical details of the turbine.



5. 10% Deposit of the Sale Amount: The deposit is required after inspection as reservation fee.



6. 50% of the total purchase price shall be paid upon delivery of the Factory Acceptance Test (FAT) certificates/reports for the units.



7. 40% Payment of Remaining Balance: The remaining 40% must be paid before equipment mobilization.



8. Equipment Delivery and Shipment: Upon receipt of final payment, we will prepare the equipment for shipment.



#sch

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

OFFER NEW MTU 12V4000L64FNER Restored! 1962 Mack B67 Tractor 2007 Volvo G946 Road Grader 1996 Case 590 Super L 4x4 Backhoe Loader 2009 Challenger/ CAT MT855C Tractor FOR SALE :  Komatsu WA900-3EO