Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


Siemens SGT-A05 generators ideal for Venezuela


Siemens SGT-A05 generators ideal for Venezuela

Inquire

Catalog #184134

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: July 07, 2026 02:14

Siemens SGT-A05 generators ideal for Venezuela

Can offer 6 Siemens SGT-A05 at 60 Hz with the option to convert them to 50 Hz.



The units are in Houston, TX.



The price per unit is 4.4 million EUR each at take all 6 actual available units.



DETAILS:



LOW HOUR AERO-DERIVATIVE GAS TURBINE PACKAGES OUTPUT POWER @ ISO CONDITIONS: 5.7 MW, 2.6KV, 60HZ, CAN CONVERT TO 50 CYCLE NOW. A05 SIEMENS LIGHTWEIGHT AERO-DERIVATIVE GAS TURBINE PACKAGE SOME DRY GAS FUEL SYSTEM WITH DRY LOW EMISSIONS (DLE) COMBUSTORS SOME WET GAS FUEL SYSTEM WITH WET LEAN EMISSIONS (WLE) COMBUSTORS FUEL TYPE: LNG, CNG, FIELD/LINE GAS 128,000LBS 9’8” WIDE X 50’ LONG X 12’8” HIGH NOISE SUPPRESSION SYSTEM AVAILABLE YEAR OF MANUFACTURE 2017 TO 2020 HOURS RECORDED IS BETWEEN 419 TO 7594 HOURS TURBINE SPECS A05 SIEMENS LIGHTWEIGHT AERO-DERIVATIVE GAS TURBINE PACKAGE PGAS REQUIREMENTS – MODULAR DLE TURBINE MAX FLOW RATE PER TURBINE: 40-60 MCF PER HOUR SUPPLY PRESSURE 270 – 280 PSI MIN GAS TEMPERATURE 36F ABOVE DEW POINT MAX GAS TEMPERATURE 200F MIN/MAX LHV 800 – 1100 BTU WOBBE INDEX 1170 ±130 BTU/SCF MAX LIQUIDS NO LIQUIDS/MOISTURE/OILS PERMISSIBLE MAX PARTICLE SIZE 1µM ETHANE CONTENT <10% GAS REQUIREMENTS – MODULAR WLE TURBINE MAX FLOW RATE 40-60 MCF PER HOUR SUPPLY PRESSURE 270 - 280 PSI MIN GAS TEMPERATURE 30F ABOVE DEW POINT MAX GAS TEMPERATURE 200F MIN/MAX LHV 600 – 2000 BTU MODIFIED WOBBE INDEX 1040 -1300 BTU/SCF MAX LIQUIDS NO LIQUIDS/MOISTURE/OILS PERMISSIBLE MAX PARTICLE SIZE 1µM



We can convert them to 50 Hz. This would cost 650k Euro/unit.



The time to get the generator end delivered (at 50 Hz.) is 4-6 months. And the process would be purchase the units and we move it to the shop for you.



#amirabo



Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

1980 North West 50D Drag Line 2 - 2004 INGERSOLL-RAND AIR COMPRESSORS