Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


Please note that there an urgent request originated by the genuine buyer to procure multiple gas turbine power generation units (mobile or trailer-mounted 60 Hz units), below are the minimum requirements:


Please note that there an urgent request originated by the genuine buyer to procure multiple gas turbine power generation units (mobile or trailer-mounted 60 Hz units), below are the minimum requirements:

Inquire

Catalog #185759

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: August 24, 2026 03:00

Please note that there an urgent request originated by the genuine buyer to procure multiple gas turbine power generation units (mobile or trailer-mounted 60 Hz units), below are the minimum requirements:



1) Capacity: 30 MW or greater per unit

2) Frequency: 60 Hz only

3) Configuration: Mobile, trailer-mounted, or similarly transportable package

4) Preferred condition: Brand new / 0 operating hours.

5) Lead time is almost immediate ( long lead time for manufacturing is not acceptable).

6) Warranty: Manufacturer warranty strongly preferred; alternatively, a credible technical warranty supported by a qualified engineering company

7) Fuel: Natural gas, dual-fuel (natural gas/diesel), or technically equivalent configuration

8) Preferred technologies/models:

GE TM2500 / TM2500+G8

Siemens Energy SGT-800

Mitsubishi / Pratt & Whitney FT8 MOBILEPAC

Other equivalent mobile or rapidly deployable gas turbine systems are acceptable.

Refurbished or low-hour units are willing to be considered if the technical condition, maintenance history, inspection results, and warranty/support package are satisfactory.

Purchase of multiple units as a package is preferred rather than individual turbines. Ideally, looking for opportunities involving 5, 10, or more units. However, smaller packages will be reviewed if the equipment is particularly attractive.



The buyer has his own technical inspectors available to travel for physical inspection of suitable equipment. Following satisfactory inspection and completion of the applicable compliance process, the parties would proceed toward a formal Sales & Purchase Agreement (SPA).



At the initial stage, no need for an extensive technical dossier. instead, a table of information containing the following information would be sufficient for our preliminary evaluation:



1) Item: Information Required

2) Quantity: Number of units available

3) Manufacturer Brand

4) Model Exact model

5) Capacity: MW per unit

6) Frequency: 60 Hz

7) Condition: New / 0 hours / used / refurbished

8) Operating Hours If applicable

9) Location: City & country

10) Fuel: Natural gas / dual-fuel / other

11) Warranty: Manufacturer or technical warranty (if any)

12) Delivery Terms: EXW / FOB

13) Price per unit (FOB or EXW)



Please treat this request on urgent basis. I appreciate your quick response and competitive list of equipment available.

#abed.ha

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked: