purchase requirement for one (1) Complete New Rotor Assembly for a GE Frame 6B gas turbine
Client has a genuine & immediate purchase requirement for one (1) Complete New Rotor Assembly for a GE Frame 6B gas turbine, Model MS6001B / PG6581, and invite your best technical and commercial proposal as follows.
1. Rotor Requirement
OEM / Original Design: General Electric (GE)
Model: MS6001B / PG6581 – Frame 6B
Application: Generator Drive
Rated Speed: 5,105 rpm
Quantity: One (1) Complete New Rotor Assembly
Condition: Brand new, zero operating hours, never installed, operated, refurbished, or repaired.
The rotor shall be a complete assembled unit, fully compatible with the existing turbine, and shall include at minimum:
Main rotor shaft
All compressor and turbine discs
17 compressor stages with all moving blades installed
3 turbine stages with all moving blades / buckets installed
Spacers, tie rods / tie bolts, thrust collar, coupling flange, seals, lock plates, balancing weights, and all other components required for a complete rotor assembly in accordance with the applicable OEM configuration/BOM.
Please provide a detailed Rotor Bill of Materials (BOM) with the quotation.
2. OEM Status and Technical Compliance
Please clearly state whether the offered rotor is:
GE OEM New
OEM-Equivalent New
Aftermarket New
For any non-GE OEM rotor, please provide the technical basis for equivalence, design/manufacturing specifications, material traceability, relevant engineering documentation, and available evidence of successful service of the proposed design.
Non-OEM offers will be subject to Buyers technical approval prior to purchase order.
The rotor shall be suitable for continuous operation at 5,105 rpm, with applicable critical-speed / rotor-dynamic verification provided.
3. Inspection, Testing and Documentation
The rotor shall be manufactured, inspected and tested in accordance with applicable OEM/GE requirements and relevant international standards.
As applicable, the inspection and test package shall include:
Dimensional, concentricity/coaxiality and rotor runout inspection
Material certificates and full material traceability
Heat-treatment records for critical components
NDT, including MT / UT / PT as applicable
Dynamic balance report
High-speed dynamic balance report/certificate
Overspeed test certificate
Critical-speed / rotor-dynamic verification
Final Inspection & Test Reports
Certificate of Conformity / Final Release Certificate.
Dynamic balancing shall comply with applicable OEM/GE requirements and ISO 21940-11 or applicable current standard. The balance grade, acceptance criteria and residual unbalance shall be stated.
All test and inspection documents shall be traceable to the supplied rotor by serial number.
4. Warranty and Technical Supervision
Minimum required warranty:
8,000 operating hours or 24 months from successful commissioning, whichever occurs first.
Please state all warranty terms, conditions and exclusions, including the proposed warranty commencement date.
Please also quote separately for qualified technical supervision of:
Rotor installation
Alignment / installation checks
Start-up
Commissioning
Final technical acceptance.
Please state personnel requirements, man-day rates, estimated duration, travel/accommodation costs, tools/equipment responsibility, and other applicable charges.
5. Commercial Offer
Please provide:
Complete rotor price
Manufacturer and country/place of manufacture
Country of origin
OEM status
Manufacturing and delivery lead time
Incoterms® 2020 and named place
Payment terms
Offer validity, preferably minimum 90 days
Currency
Warranty
Installation/commissioning supervision cost
Taxes/duties, if applicable
Export packing
Shipping weight and dimensions
HS Code
All exclusions, qualifications and deviations.
6. Mandatory Scope Confirmation
Please confirm in writing that the quoted price INCLUDES and the rotor will be delivered with the following installed:
All 17 compressor moving-blade stages
All 3 turbine moving-blade / bucket stages
Any item or service excluded from the above scope shall be clearly listed in a separate Exclusions / Deviations section.
7. Final Compatibility
Final compatibility will be verified against the actual turbine prior to purchase order, including, as required:
Gas turbine Serial Number
Existing rotor Serial Number
GE Part Numbers
GE Drawing Numbers
Existing rotor configuration and relevant dimensional data.
Please identify any information required from the Buyer to prepare a firm technical and commercial offer.
8. Supplier Confirmation
Please provide the above compliance confirmation on your official company letterhead, signed and stamped, confirming that the proposed rotor is new, zero-hour, never installed/operated/refurbished/repaired, technically suitable for GE Frame 6B / MS6001B, and includes the complete scope specified herein.
We look forward to receiving your best technical and commercial offer at your earliest convenience.
#Khosro