Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


SGT 400 for sale on LC term


SGT 400 for sale on LC term

Inquire

Catalog #186273

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: September 15, 2026 04:15

SGT 400 for sale on LC term

Available in China

They deal with 90% LETTERS OF CREDIT AFTER 10% Deposit into escrow

No hours. 200

Price FOB China port USD 13.75 million for both units

2019 and 2020

SGT400



SGT400 Unit Basic Information Schedule



?? / Description:????????????????,????????????????????????????????????,??????????????????????????????

We have completed full verification of all unit inspection items. All equipment parameters, operational data, system status, technical documents and spare parts information are fully available, authentic and complete with no omission. We support all subsequent verification, business liaison and document handover.



??No.



????InspectionCategory



??????DetailedInspectionItems



??????FeedbackResult



????SupplementaryRemark

1

??????Unit Time Information



??????????????????Year of unit manufacturing, installation and official commissioning



1. ????2019?;



2. 2020??????



Manufactured in 2019; installed and commissioned in 2020.



7d550cb6a25f729e5b2baa1e8b290da2



279aae8122bf902da8a19b17a8f4863d

2

???????Equipment Completeness



???????????:?????????????????????????????????????????????????????????Check the completeness of full-set equipment, including gas turbine, generator, auxiliary system, control system, lubricating oil system, gas system, cooling system, starting system, intake and exhaust system, electrical system, etc.



?????Fully available



???????????,??????????

Full equipment package list is provided to verify complete unit configuration

3

??????Equipment Supply Scope



??????????????????????????????????????Included equipment, excluded equipment, removed equipment, on-site retained equipment, items requiring separate quotation, available document list



1. ??????????????;



2. ??????????????????



3. ?????????



It covers the full set of equipment for normal operation of the gas turbine,excluding the main and auxiliary equipment of steam turbines and waste heat boilers. All equipment is retained on site with no dismantling.



????????



The client may conduct on-site verification.

4

????????Unit Operation Data



?????????Total accumulated operating hours of the unit



1.MW451 ??237??



2.MW449 ??243??



????_20260521134439_664_1558



????_20260521134438_663_1558

5

????????Unit Start-up Data



????????Total accumulated start-up times of the unit



1.MW451 ??36?



2.MW449 ??33?



????_20260521134439_664_1558



????_20260521134438_663_1558

6

??????Fuel Configuration



??????(???/??/????/???)???????????????????????Existing fuel type (natural gas/diesel/liquid fuel/dual fuel), dual fuel modification feasibility, liquid fuel operation capability



??????



Currently configured for single natural gas fuel operation.



??????????????????



Dual-fuel conversion is supported, and the unit is equipped with liquid fuel operation capability.

7

??????Auxiliary System Status



??????????????????????????On-site pipeline integrity, cable integrity, system connection and overall intact status



????Fully available



??????????????,?????

All pipelines, cables and system connections are intact and available for on-site inspection

8

????????Full Set of Technical Documents



??????????OEM????????????/?????????????????????Maintenance records, operation logs, OEM original certificates, upkeep records, preservation reports, overhaul records, technical documents and drawings



?????Fully available



?????????????,??????,???????

Complete hard and soft copy technical documents are ready for handover

9

??????Spare Parts Configuration



???????:??????????????????????????????????????Spare parts package including filters, seals, sensors, valves, control modules, hot-section spare parts and common wearing parts



?????



No spare parts provided.



????????????

Spare parts are subject to separate quotation and settlement.



?:?????????????



Note: Please refer to the appendix file for the unit equipment list.



??:???????????????????????????????????????????????????????????????????????????????



English: The unit’s timing parameters, full-set equipment, supply scope, operational data, fuel configuration, system condition, technical documents and spare parts information are authentic, complete and accurate. We are available on-site to support customer’s inspection, acceptance and commercial coordination.



#desilv





Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

We are developing a 50 MW HFO power project in Burkina Faso and are looking for immediately available medium-speed generator sets.  Solar Taurus 70 gas turbine, version 10302