Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


Our clients Company is registered in Dubai, United Arab Emirates and are are associated with an American Company developing a large AI Data Centre together with energy infrastructure exceeding 1GW of power.


Our clients Company is registered in Dubai, United Arab Emirates and are are associated with an American Company developing a large AI Data Centre together with energy infrastructure exceeding 1GW of power.

Inquire

Catalog #186490

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: October 01, 2026 04:09

Our clients Company is registered in Dubai, United Arab Emirates and are are associated with an American Company developing a large AI Data Centre together with energy infrastructure exceeding 1GW of power.

Our client have the mandate; signed and are asking us for selection of suitable Gas Turbine packages.

They are evaluating a wide range of equipment offered

At the moment, the focus is on a 373MW GE VERNOVA 9HA.01 Gas Turbine Package.

If you can offer such a plant equipment please do send a full detailed offer and current condition. It is understood that a GE VERNOVA 9HA.01 Gas Turbine manufactured in year 2015 has been kept under storage / preservation, in original packages, for 10 years. We were told this was sold but others state it remains available . If available and you can confirm it in order to assess the current condition gas turbine generator package, we request you to share the following information and documents. 1. Equipment OEM serial number

2. GE Field Core Inspection

3. Borescope Reports

4. Generator Inspection Reports

5. Packing Lists

6. OEM Performance Data

7.Preservation Records

Furthermore, it is understood that the Gas Turbine package is meant for 50Hz operation, while it is feasible to convert it to 60Hz operation by altering the Generator (or) its parameters we have advised the client it is NOT economically viable so if you have any 60HZ alturnative to a 373MW GE VERNOVA it will be MOST welome . We request you to provide relevant details, which will be of importance.

#vvnbra



Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

For Sale - The complete Tire Shredding & Separation Line enbacher, JGS 420 GS-N.L, 2013, Containerized Natural Gas Generator Set, 1,489 kW, 50 Hz Cummins, QSV91, Natural Gas Generator Set, 1,250 kW, 1,562.5 kVA, 60 Hz, 800 Hours GE, LM2500+, 1996, Natural Gas Combined Cycle Power Plant, 26.6 MW, 50 Hz