4 NEW Siemens SGT 5-6 2000E 166 MW, 60 HZ
4 NEW Siemens SGT 5-6 2000E 166 MW, 60 HZ
Please be aware there is an LOI on these these 4 each 166 mw ,60 hz Turbine sets, however until now no deposit has been paid so remain available for now.
Typical installation for reference
SIEMENS SGT5/6-2000E (94.2)
GENERATION PACKAGE
POWER GENERATION
Gas fired FREQUENCY (60 Hz)
Technical Overview
Model: Siemens SGT5-6-2000E (Version 94.2)
base (separately quoted service) Conversion for 60Hz operation:
All new additional equipment shall carry the manufacturer’s warranty 12 months minimum.
All existing switch gear shall be operational through frequency converters to ensure 50/60Hz operation throughout the entire power plant.
Design Features:
• Proven Siemens E-class technology with >30 years of operational track record
• Modular construction for ease of transport, installation, and inspection
• Long component life and robust preventive maintenance regime
• High reliability and low operating costs
Commercial Offer
• Price per Turbine Unit: €135 million
• Price per Gearbox: €4,944,700 million
• Price per Generator: €8,987,200 million
• Delivery Terms:
• Timeline Tu rbine Units: Immediate availability; 4 weeks FCA (Incoterms 2020) after full payment
• Time Gearbox and Generator: FCA Delivery is estimated at 8 to 9 months. LONG BEFORE TURBINE INSTALLATION
Exclusions
• Transportation beyond FCA
• All duties and taxes Exhaust Characteristics
• Exhaust gas flow: ~368 kg/s (˜ 811 lb/s)
• Exhaust temperature: ~532 °C (˜ 990 °F)
Dimensions & Weight (Gas Turbine Only)
• Length × Width × Height: ~9.1 m × 3.3 m × 3.3 m (˜ 30 ft × 11 ft × 11 ft)
• Weight: ~108,000 kg (˜ 238,000 lb)
Reliability & Maintenance
• Fleet reliability: >99%
• Equivalent operating hours (EOH) across fleet: > 9 million
• Maintenance-friendly design:
o Horizontally split casing for easy rotor access
o Walk-in combustion chambers
o Hot-path inspection without lifting upper casing
o Rotor with Hirth-serrated discs for on-site disassembly
General Commercial Terms:
Delivery Location: 4 weeks FCA (according to INCOTERMS 2020) after inspection & deposit payment
Payment: Irrevocable Documentary Letter of Credit (L/C) or as agreed
Warranty: 12 months post-commissioning, Siemens supervised
Includes: Technical documentation, manufacturer certifications, operation manuals
Inspection: To be carried out jointly with Siemens personnel, who will certify the equipment supplied
Offer Validity: Subject to prior sale
Purchase Procedure:
with mutual agreement on contractual clauses.
4. Full Data Disclosure: Once signed, we will disclose all technical details of the turbine.
5. 20% Deposit of the Sale Amount: A deposit is required to secure the turbine sets.
6. 50% of the total purchase price shall be paid upon favorable inspection.
7. 30% Payment of Remaining Balance: The remaining 30% must be paid via Letter of Credit before equipment mobilization.
8. Equipment Delivery and Shipment: Upon receipt of final payment, we will prepare the equipment for shipment.
9. Gearbox and Generator: 50% after inspection
50% on ready to ship
Preliminary SCOPE OF SUPPLY FOR SGT5/6-2000E GTG package per SINGLE UNIT
No.
Items
Specifications
Unit
Qty.
Origin
Manufacturer
1
Gas turbine body (including compressor, t wo cylindrical combustion chambers,
turbine, dry low NOx combustion system,
ignition system and sealing system, body drainage system, supports and embedded parts.
set
1
Siemens/SEC
2
Pipe support
set
1
SEC
3
Turning device
set
1
SEC
4
Front module
set
1
SEC
5
Gas Module
set
1
SEC
6
Water washing system and connecting hose
set
1/2
SEC
7
Drying module
set
1
SEC
8
Gas turbine casing and internal lighting (including basic embedded parts)
set
1
SEC
9
Gas turbine insulation
set
1
SEC
10
Lubricating oil module
set
1
SEC
11
Mobile lubricating oil purification device
set
1/2
SEC
12
Turbine and casing anchoring system
set
1
SEC
13
Insulation and paint
set
1
SEC
14
Air intake system (self-cleaning, with de- icing system)
set
1
SEC
15
Exhaust system (including metal and non- metal expansion joints)
set
1
SEC
15- A
Exhaust Vertical Pipe Extension
Site Specific
By Installer (E&C)
15- B
Turbine oil Cooler
Site Specific
By Installer (E&C)
16
Internal connecting pipes and supports, i ncluding connecting pipes between the
front module (outside the plant) and the gas
module (inside the plant)
set
1
SEC
17
All other necessary auxiliary systems
set
1
SEC
18
Special tools