Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


Siemens GAS Turbine: SGT600DLE, Year: 2011, hours: 553, Fuel: Dual(Natural Gas), power: 25mw, 10.5kv, 50hz


Siemens GAS Turbine: SGT600DLE, Year: 2011, hours: 553, Fuel: Dual(Natural Gas), power: 25mw, 10.5kv, 50hz

Inquire

Catalog #181776

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: February 18, 2026 23:18

Back on market buyer failed



Siemens GAS Turbine: SGT600DLE, Year: 2011, hours: 553, Fuel: Dual(Natural Gas), power: 25mw, 10.5kv, 50hz



Siemens GAS Turbine

Model: SGT600DLE



Dual Shafts



Emission type: DLE(Dry Low Emission)



Made in Sewden



Year: 2011,



Power Turbine speed: 7759rpm



Equiv.Working hours: 553



Number of start:52times



Total Service time: 374



Equiv Operating Cycles: 58



Fuel:Dual(Natural Gas),



power: 25mw,



Voltage: 10.5kv



Frequnecy: 50hz(Gearbox Ratio:5.172,speed:7759rpm down to 1500rpm,alternator speed:1500rpm )



Quantity of Shafts: Dual Shafts(may drive for compressor)



scope of supply:



1-High Pressure Compressor,2-Combustor,3-High Pressure PT,4-PT,



5-GearBox(Voith),6-Alternator(ABB),7-Gas control part,8-Control room,9-Recovery Heat Boiler



10-Original manual book,11-Chimney,12-Transformer,13-Dryer,15-Fans,16-Airconditionr,17-Control boxes



18-Control computer,19-Cable,20-Lube system,20-some new spare parts



reduced package.price:13,990,000usd Fob Shanghai port,China



or negotiating



maintenance record:



a-The maintenance mainly involves passing hot air from the dryer to the combustion chamber. We have previously tried turning the dryer. Desiccant is placed inside the steam drum of the waste heat boiler.



b-The last run was in December 2017, and it was started every three months for about a year. Finally, we communicated with Siemens to adopt a long-term maintenance method, so we did not attempt to ignite again.





Inquire
ADDITIONAL INFORMATION



People That Have Inquired On
This Item Also Liked:

3 Nos SOLAR T 130 - Year 2016 / 2017 - Zero Hours - Ref : P/AA-87- 10.02 SOLAR TAURUS 60,Year:2016, 5.67 MW For Sale - Ref : P/AA-87 -10.02.26