For Sale - Ref S26022026-3 3 x "New & Unused" Siemens SGT5-2000E Power Plant Package - 50Hz - Max Power Output 670 MW (Zero Firing Hours)
FOR SALE :
3 x Siemens SGT5-2000E Power Plant Package - Max Power Output 670 MW (Zero Firing Hours)
This offering represents an exceptionally rare chance to secure unused, zero-hour Siemens SGT5-2000E combined-cycle modules—a class of assets normally reserved for sovereign utilities and top-tier operators. The scale, brand pedigree, and immediate availability place this package in a category with virtually no global competition.
To maintain integrity of process and protect all parties, priority will be given strictly to the first buyer who demonstrates capability and commits to the transaction pathway.
Delays caused by unverified intermediaries or non-mandated parties will not be entertained.
Beyond the commercial advantage, the technical value is decisive: the SGT5-2000E platform offers true multi-fuel flexibility, operating on natural gas, low-calorific gases, CO2/H2S/N2-contaminated gases, crude oil, distillate fuel oil, heavy fuel oil, and refinery-residue-type liquids. This ensures operational resilience, security of supply, and adaptability across diverse grid, industrial, and geopolitical environments.
Asset Summary
Siemens SGT5-2000E – Dry Low NOx Gas Turbines Status: Unused (Zero Firing Hours)
Configuration: 3 × Combined-Cycle Modules Total Output: ~670 MW
Replacement Production Order Price will be over € 1 Billion EUR with delivery in 2032!!!
Our Negotiated Cost Price Offer: € 130000000.- EUR - EXW
Per Module:
Gas Turbine: 166 MW
Steam Turbine: 57.3 MW
Total Output: 223.3 MW
Voltage: 10.5 kV | Frequency: 50 Hz
Fuel: Natural Gas (Dual-Fuel)
Technical Highlights
Horizontally split casing
Walk-in combustion chambers (no cover lift for HGP inspection)
Ceramic-tile combustion liners (individually replaceable)
16-stage axial compressor with variable-pitch IGVs
Optional fast IGVs for peak-load & frequency stabilization
Four-stage turbine; blades removable with rotor in place
Hybrid burners (premix/diffusion) for gas, fuel oil, heavy oil, refinery residues
Low-NOx combustion system
Fleet reliability >99.5%
380+ units in operation, 16M+ operating hours
Combined-Cycle Reference Performance:
Net Output (1×1 / 2×1): 253 MW / 512 MW
Net Efficiency: 52.5% / 53.1%
GT Gross Power: 168 MW / 336 MW
ST Gross Power: 89 MW / 184 MW
Package Inclusions
Siemens SGT5-2000E Gas Turbines (Zero Hours)
Siemens Steam Turbines (57.3 MW each)
Steam Turbine Alternators
Generators (SGen5-100A-2P or equivalent)
Auxiliary systems
Electrical & control systems
Balance-of-plant interfaces
Engineering documentation & manuals
Siemens SGT5-PAC 2000E modular package architecture
Commercial Terms
Availability: Immediate Location: Ready for inspection & export
Transaction Procedure (Strict)
Designed to ensure compliance, eliminate chain-broker interference, and protect all parties.
1. Letter of Intent (LOI)
Corporate letterhead
Confirms intent, mandate authority, and acceptance of procedure
2. Proof of Funds (POF) / Bank Comfort Letter (BCL)
Issued by top-tier bank
Soft POF acceptable initially
Hard POF required before inspection
3. KYC / Compliance
Corporate registration
UBO identification
AML/KYC documents
Passport copies of signatories
4. NCNDA / IMFPA
ICC-format NCNDA
IMFPA executed after mandate verification
No multi-layer broker chains
5. Escrow Setup
Via top-tier bank or licensed escrow attorney
Buyer deposits inspection security
Funds locked until SPA milestones
6. Technical Inspection
On-site inspection by buyer’s engineers
Verification of zero-hour status, serials, documentation
7. SPA Execution
Under Swiss, UK, or UAE commercial law
Includes delivery, dismantling, export terms, warranties
8. Payment & Transfer
Escrow release upon SPA conditions
Title transfer
Export documentation
Logistics coordinated with buyer’s forwarder
Commission Structure
Standard industry commission
Protected under NCNDA/IMFPA
Paid from seller side
No unauthorized intermediaries
Positioning Statement
A rare opportunity to acquire unused, zero-hour Siemens SGT5-2000E combined-cycle modules—a configuration typically reserved for sovereign utilities and strategic operators. The package delivers high efficiency, proven reliability, fuel flexibility, rapid deployment, and long-term operational resilience.
Ideal for:
National grid expansion
LNG mechanical drive
Industrial baseload
Emergency capacity deployment
Further ONLY and strictly with LOI undertaking the buyer has financial capability to act immediately and end user country
#sam