GE 9E (127 MW) HEAVY-DUTY GAS TURBINE PACKAGE
GE 9E (127 MW) HEAVY-DUTY GAS TURBINE PACKAGE
Exclusive Offer – GE 127 MW 9E Heavy-Duty Gas Turbine Package (Europe-Based, Fully Preserved, GE-Certified)
We are pleased to present an exclusive opportunity to acquire a General Electric (GE) Frame 9E heavy-duty gas turbine power plant, located in Western Europe and maintained under strict government-supervised preservation. This unit represents one of the very few immediately available large-scale power generation assets globally, at a time when the market is experiencing unprecedented shortages.
1. Global Market Context – Severe Shortage of Heavy-Duty Turbines
Across the industry, delivery times for new heavy-duty gas turbines have extended to 3–5 years, with several OEMs now quoting 2029–2030 delivery slots. This affects all major manufacturers, including GE, Siemens, and Mitsubishi Heavy Industries.
In this environment, immediate availability has become the single most valuable factor in procurement decisions. This offer provides your organisation with a rare opportunity to bypass multi-year delays and secure a fully preserved, OEM-certified turbine package at a fraction of replacement cost.
2. Asset Overview – GE Frame 9E (PG9171)
The unit offered is a 127.214 MW GE Frame 9E gas turbine package (simple cycle), manufactured in 2009, installed in 2010, and commissioned in 2011. (“Net power output as per original specification: 127.214 MW.” )
It has never been commercially operated, accumulating <500 fired hours and <100 fired starts. (“Total Factored fired hours (FFH): <500 FFH… Total Factored fired Starts (FFS): <100 FFS.” )
The turbine has undergone two GE NPI upgrades (2015 LLI + 2018 steam-injection power augmentation), both installed by GE and fully documented. (“2015 NPI upgrade LLI… 2018 NPI upgrade power augmentation; steam injection wrapper.” )
The unit has been continuously preserved under a strict program including:
Closed-loop dried/heated air circulation
Active oil systems
HVAC and space heaters
Nitrogen-blanketed piping
Monthly auxiliary equipment operation (“Closed off air intake… Oil systems active… Nitrogen blanketed piping… Monthly operation…” )
GE performed a full technical inspection in 2024, confirming excellent condition.
3. Technical Highlights
GE 9E Platform Performance (Reference: GE 9E.03/9E.04 Data Sheet)
The 9E family is a globally proven workhorse with:
132–147 MW simple cycle output
>55% combined cycle efficiency (“132–147 MW simple cycle output… >55% combined cycle efficiency.” )
The platform supports over 52 fuel types and offers up to 100% hydrogen capability in the latest configurations. (“Can run on more than 52 types of fuel… UP TO 100% HYDROGEN CAPABILITY.” )
Your offered unit is a 9E.03-based configuration, upgraded with GE’s LLI and steam-injection wrapper, improving turndown and power output.
4. Commercial Offer
New Replacement Production Order Price: € 190 Million EUR
Our Negotiated Purchase Price: € 59,9 Million EUR
This includes:
Full dismantling
Preparation and packing for shipment
GE presence during dismantling
GE certification of the process
GE recommissioning is available and can be contracted directly with GE at buyer’s discretion.
Valuation Advantage
Replacement value using the industry-standard benchmark places a comparable installation at €190 million. Independent audit reports confirm a current asset valuation of €100 million, reflecting its near-zero-hour condition, GE upgrades, and full preservation history. Your acquisition price of €49,9 million Euros represents: 75% below replacement value, Immediate availability in a market where OEM lead times are 3–5 years. This positions the asset as one of the strongest price-to-performance opportunities currently available in the global power generation market.
5. Required Documentation & Process Control
To protect all parties and ensure a structured, professional process, the following documents are required before any site access or GE engagement:
1. LOI – Letter of Intent
Outlining buyer interest, transaction structure, and timeline.
2. POF – Proof of Funds
Bank-issued confirmation demonstrating capacity to complete a €27M acquisition.
3. BCL – Bank Comfort Letter
Required by the asset owner and GE prior to scheduling any technical meetings or site visits.
These documents are standard for all high-value industrial transactions and ensure that GE engineers, site managers, and government-supervised personnel are mobilized only for qualified buyers.
6. Viewing, Inspection & Administration Costs
Due to the involvement of GE, government-supervised facility staff, and site security, the following applies:
All viewings are scheduled only after LOI + POF + BCL
Administrative & engineering mobilization fees apply for each arranged visit
Fees are fully deductible from the purchase price upon successful closing
This ensures efficient allocation of technical resources and protects the integrity of the asset.
7. Scope of Supply
The package includes (non-exhaustive):
Gas turbine
Lube oil, hydraulic oil, IGV systems
Air inlet & exhaust
Cooling & sealing air systems
MK VIeS control system
Generator (Brush BDAX-450 ERH)
Power augmentation system (steam)
Natural gas pressure reduction & heating station
CCCW cooling system
Anti-icing heating system
Enclosures, supports, interconnecting piping/cables (“Gas Turbine… MK VIes Control system… Generator… Power augmentation system… Natural gas pressure reduction… CCCW systems…” )
A full scope list is available upon request.
8. Summary
This offer provides your organization with:
A near-zero-hour GE 9E turbine
Fully preserved and upgraded
GE-certified dismantling and recommissioning
Immediate availability
A price point far below global market value
A structured, transparent acquisition process
We would be pleased to discuss technical, commercial, or logistical aspects in more detail and coordinate next steps upon receipt of your LOI and POF.
#amirab