Please do visit our trusted associate
World Source International Click Here
 
SEARCH
CATEGORIES

Aircraft
Business Opportunities / Investments
Chemicals
Clearance/Liquidations
Commodities ( Rice, Sugar , Soy Grains, Minerals and Ore)
Fire/Rescue/Medical
Food/Beverages
Housing
Military Equipment/Unrestricted
Military/Police


Pet Supply
Petroleum Product
Plant and Equipment
Recyclable-HMS-PVC
Ships/Vessels/Boats
Solar/Wind-Power
Vehicles
Wanted
Zoo supply (unrestricted )


 


Mobile Waste-to-Energy Plant - made in Malta


Mobile Waste-to-Energy Plant - made in Malta

Inquire

Catalog #183014

Catagory: Plant and Equipment  -- Power Generation
Dragon's Price: CONTACT US
Date Added: May 08, 2026 22:44

Mobile Waste-to-Energy Plant - made in Malta



Project Mobile Waste-to-Energy Plant - Malta

• Cost recovery within 2 years (1.6-year simple cost recovery)

• Internal rate of return (IRR) of 57% - significantly higher than typical infrastructure projects

Investor capital contribution: €72.5 million

• Annual waste processing rate: 280,000 metric tons

• Net electricity generation (after self-consumption): 108,000 MW/year

Business Plan

Mobile Waste-to-Energy Plant - Malta

Production capacity: 280,000 metric tons/year, 15 MW (6 x 2.5 MW) + 2 MW for self-consumption (Rankin organic cycle)

Executive Summary

Project: Construction and operation of a mobile thermal treatment plant for municipal solid waste with electricity generation.

Production capacity:

• 6 main lines, each with a capacity of 2.5 MW (total 15 MW) for exporting power to the grid.

Project: Construction and operation of a mobile thermal treatment plant for municipal solid waste with electricity generation.

Production Capacity:

• 6 main lines, each with a capacity of 2.5 MW (total 15 MW) for exporting power to the grid.

• An additional 2 MW Rankine organic cycle unit to cover the plants consumption (automatic backup).

Waste Treatment Rate: 280,000 tons/year.

Technology: Pretreatment ? Granulation ? Pyrolysis ? High-temperature post-combustion (1200-1400°C) ? Rankine organic cycle (48% electrical efficiency) ? Inert gas arc welding filtration ? Closed-loop gas cleaning (zero atmospheric emissions, no chimney). Residual ash content: 1.5-5%.

Location: Maghtab landfill (EcoHive), by agreement with WestServ.



Required

1. Non-Disclosure Agreement (Arbitration in Malta).

2. Business Plan/Terms of Reference/Follow-up Plan.

3. Financial Model (with charts)/Investors Economic Justification (100% Funding)/Detailed Implementation Plan with Gantt Chart (HTML).

4. Official Letter from the Investor with Proof of Financial Capacity.

5. Project Financing Agreement with the Investor.

6. Invitation Letter for a Meeting with the Authorities.

7. Visit to Malta to Review Project Details, Meet with a Maltese Representative, and Register the Company in Malta.



note :

After signing the Non-Disclosure Agreement (Arbitration in Malta),

and receiving the Official Letter from the Investor,

you will be provided with the project documents and the procedures will be completed.



#serk

Inquire
ADDITIONAL INFORMATION

People That Have Inquired On
This Item Also Liked:

SIEMENS SGT 700 DLE - Year 2020 - CCPP - 45 MW - Ref : P/AA-87 - 5 3 Nos - CAT 3512 B , 480 V , 50/60 Dual Frequency , Year 2009 4 x Brand New MAN 12VP185 Marine Engine 4 Units in Stock for sale