GE LM2500+G4 DLE Gas- Turbine Generator Set (2 Units)
GE LM2500+G4 DLE Gas- Turbine Generator Set (2 Units)
NOTE Price will only be given with serious expression of immediate intent with NAMED end user country
This is aeroderivative gas- steam combined cycle power plant, fully equipped with complete auxiliary systems.
1. Power Output (ISO Condition)
· Simple- cycle net output per unit: 33- 34.4 MW
· Total installed capacity for 2 units: 66- 68.8 MW
· Single unit power range: 25- 35 MW. Dual- unit layout supports future capacity expansion according to actual power demand.
Unit is 50 HZ conversion to 60 hz is not financially viable
2. Fuel System
Adopt DLE (Dry Low- Emission) combustion technology for low NO? emission to meet environmental requirements. Dual- fuel configuration: Natural gas + Diesel. It can automatically switch to diesel fuel for continuous power generation in case of natural- gas supply interruption
Good physical condition. Complete documents are available AFTER LOI and POF, including maintenance reports, borescope inspection records, start- stop log and remaining- life assessment report. All core components are original OEM parts with sufficient remaining service life.
4. Main Equipment & Auxiliary Scope
1. Gas turbine generator package: LM2500+G4 gas turbine, generator unit, inlet air filter & silencer, exhaust system.
2. Heat Recovery Steam Generator (HRSG): Recovers waste heat from
gas- turbine exhaust to produce steam for combined- cycle power generation, with complete steam piping, platforms and accessories.
3. Fuel- gas conditioning skid: Gas pressure regulating, filtering and metering assembly for gas supply of gas turbine.
4. Cooling water system: Forced- draft cooling tower, circulating- water pumps
and large- bore circulating- water pipelines, providing cooling for the whole plant.
5. Step- up power transformer & high- voltage switchgear: Step- up the generator voltage and connect to external power grid.
6. Control & protection system: Control cabinet, excitation system, protection
devices, start- up system, lube- oil module and all necessary auxiliary skids for reliable unit operation.
Aeroderivative gas turbine with abundant global operation references. Modular construction ensures convenient site installation and relatively low maintenance cost. Global spare- parts supply chain is well- established.
6. Supply & Delivery
Equipment is in stock for short delivery lead time. Supply scope covers
gas-turbine main body, generator, control system, excitation system, protection system, starting system, dual- fuel system, inlet & exhaust system, HRSG,
cooling- water system, fuel- gas skid, step- up transformer and all auxiliary machinery required for full- set operation.
Our Full-Chain Service — From Site to Your Plant
we have ability to provide a complete end-to-end solution:
? Pre-Sale Inspection — Full equipment condition report by professional engineers before your purchase
? Dismantling & Site Clearance — Our experienced team handles the complete dismantling,
including civil disconnection and site cleanup
? Surface Restoration — Sandblasting, anti-rust treatment, and professional repainting before export
? Export-Grade Packing — Sea-worthy industrial packing suitable for ocean transport to any port
worldwide
? International Logistics — Full container & breakbulk shipping; we handle port documentation and customs clearance
? Installation & Commissioning — Technical engineers available for on-site installation, and
startup support
? Spare Parts Supply — Original and OEM spare parts available for the entire production line Technical Specifications
FAQ — Questions Buyers Ask Most
Q: What is the current condition of the production line?
A: The line is currently stored and available for physical inspection. We provide a full inspection report with photos and running status before you confirm the order.
Q: Do you provide installation engineers?
A: Yes. Our technical team has extensive experience with cement production line installation. Engineers are available for on-site supervision and commissioning. 30+ Foreign Engineer from Egypt and Indian, Covering Electricity , Mechanical , Design, Civil , Foundation , Contractor .....
Q: What payment methods do you accept?
A: We require 10% deposit into escrow balance can be Letter of Credit (L/C at sight) if from prime bank and Telegraphic Transfer (T/T).
Q: How long does delivery take?
A: Dismantling will take 2 months after deposit. Ocean shipping depends on destination port. Total lead time is typically 12 months from order confirmation.
Q: Can you ship to Dubai / Karachi / Alexandria/Syria /Yemen/ Afganistan/ Iraq
A: Yes. We have extensive experience shipping to Middle East ports (Dubai, Jeddah, Doha),India Pakistan (Karachi), and Egypt (Alexandria, Port Said). Siria( Lattakia ,Tartous ) , Nigeria
( Lagos , Apapa) , Tuerkey(Istanbul) ,Russia ETC
Q: Can you Redesign and erection +commission
A: Yes, our Join Venture company own a team with 30+ mature foreigner engineers(Egyptian, Indian, Chinese) covering the Electricity ,Mechanical , Civil , Foundation , Constructing , Commission contractors . Can be supervisor to all over the worlds for supporting
#desil