RFQ for Turkey, 50 HZ
RFQ for Turkey, 50 HZ
We have an active requirement from our end user for a Siemens SGT-300-1S Gas Turbine Generator Set, approximately 8 MW, for power generation.
Please check whether you can offer a suitable unit and provide your complete technical and commercial proposal.
The most important point is the fuel system configuration.
The customer requires a genuine dual-fuel system. We are not referring to single-shaft / twin-shaft configuration.
By dual-fuel, we specifically mean a turbine equipped to operate on both:
Gaseous fuel
Liquid fuel / diesel
Please confirm whether the offered unit has two independent fuel trains / fuel supply systems for gaseous and liquid fuel, including the corresponding pumps, filters, heaters, valves, injectors/nozzles and control equipment as applicable.
Please also confirm whether the control system allows automatic or manual switching between gaseous fuel and liquid fuel.
In addition, please clarify the following:
Exact model and configuration
Siemens SGT-300-1S?
Single-shaft configuration?
Power generation application?
Rated electrical output?
Generator voltage and frequency?
Dual-Fuel System – VERY IMPORTANT
Is the turbine genuinely dual-fuel?
Can it operate on both natural gas and diesel?
Are both gas and liquid-fuel systems physically installed on the offered unit?
Are there two independent fuel lines/trains?
Are the required pumps, filters, heaters, valves and fuel injectors/nozzles included?
Can the turbine switch between gas and diesel during operation?
Is switching automatic, manual, or both?
Please provide the fuel system P&ID, technical description or OEM documentation confirming this configuration.
APG / Associated Petroleum Gas
The end user intends to use Associated Petroleum Gas (APG).
Please confirm whether the offered turbine can operate on APG.
If yes, please provide:
Required gas composition
Minimum/maximum LHV
Gas pressure requirement
Permissible H2S content
Permissible liquids/moisture
Other fuel quality limitations
Whether any modification or additional gas-conditioning equipment is required
Equipment Location
Please confirm the exact current location of the turbine:
Country
City
Site / warehouse
Is the equipment currently located in Turkey, China, Europe or another country?
Inspection Before Contract
Our customer may require a physical inspection before concluding the final purchase contract.
Please confirm:
Where can the inspection be performed?
Can our customers technical representatives visit the unit?
Can the turbine, generator, auxiliary systems and control system be inspected?
Can nameplates and serial numbers be checked during inspection?
Is borescope inspection possible if required?
Can existing test reports and maintenance/preservation records be reviewed during inspection?
Price Basis
Please provide your best price and clearly indicate the commercial basis.
For example:
EXW
FCA
FOB
CPT
CIF
DAP
Please specify exactly where the quoted price applies.
Delivery Period
Please indicate the realistic delivery/readiness period.
If you state, for example, 2–3 months, please clarify what this means:
2–3 months until equipment is ready for shipment?
2–3 months to port of loading?
2–3 months to customers destination?
Please state the exact delivery point.
Condition and Operating History
Year of manufacture
New / unused / used
Actual operating hours
Number of starts
Factory test history
Site commissioning history
Has the turbine ever been synchronized to the grid?
Has it ever operated under load?
Current preservation/storage condition
Serial Numbers and Nameplates
Please provide available:
Turbine serial number
Generator serial number
Package serial number
Photos of all major nameplates
Scope of Supply
Please provide a detailed list of everything included in the offer, including:
Gas turbine
Gearbox
Generator
Gas fuel system
Liquid fuel / diesel system
Lubrication system
Starting system
Intake system
Exhaust system
Enclosure and ventilation
Fire detection/suppression system
Control system / HMI
Electrical equipment
Auxiliary systems
Spare parts
Documentation
Warranty
Please confirm whether you can provide the following warranty:
8,000 operating hours or 12 months after commissioning, but not less than 18 months after delivery.
Maintenance / Design Life
Please confirm the applicable maintenance and major inspection intervals.
Our customers requirement is approximately:
Inspection B: 24,000 operating hours
Inspection C: 48,000 operating hours
Please confirm whether these intervals are applicable to the offered SGT-300 configuration and provide supporting OEM documentation if available.
Commercial Information
Price
Incoterm
Payment terms
Availability
Reservation conditions, if any
Lead time
Packing
Transportation possibility
Installation / supervision
Commissioning
Training
Spare parts support
Please send us the technical specification, Scope of Supply, actual photos/videos, nameplate photos and all currently available supporting documentation.
This is an active project and the above technical points, especially the actual dual-fuel configuration, APG compatibility, equipment location, inspection possibility and price/delivery basis, are critical for the customers evaluation.